8TH SEMESTER PROJECT VIVA SCHEDULE- 2018
SL NO ROLL NO TOPICS GUIDES Time
1 C-(10,15.22,24,57,63)/14 SPECIFIC PLANNING OF DIFFERENT BUILDINGS OF JORHAT ENGINEERING COLLEGE CAMPUS, JORHAT PKK
2 C- (76,79,80)/15(D), 73/13 DESIGN OF FLEXIBLE PAVEMENT USING IRC 37:2012 KK
3 C- (33,34,36,64,65)/14 STUDY AND DESIGN OF A RCC BOX CULVERT GH
4 C- (35,39,71,73,78),14, 80/13 THICKNESS DESIGN OF DIFFERENT LAYERS OF A FLEXIBLE PAVEMENT AND BLENDING OF MATERIALS FOR INDIVIDUAL LAYERS AS PER MORTH GUIDELINES RG
5 C- (08,13,16,52)/14 PREPARATION OF ALIGNMENT AND ESTIMATION OF CUTTING AND FILLING FOR 4-LANE HIGHWAY AT JORHAT BYPASS USING DGPS AND GIS MKD
6 C- (14,67,74)/14, 77/15(D), 02/11 ANALYSIS AND DESIGN OF G+2 RESIDENTIAL BUILDING USING COMPUTER AIDED DESIGN AND ESTIMATION NMC
7 C-(01,46,54,58,59)/14 STUDY OF EROSIONAL AND DEPOSITIONAL PROCESS AND BANK STABILITY ANALYSIS OF BHOGDOI RIVER IN AND AROUND HATIGARH TEA ESTATE, JORHAT MKD
8 C- (03,07,55,61,77)/14 THICKNESS DESIGN OF VARIOUS COMPONENT LAYERS FOR SUPPORTING RIGID PAVEMENT AND CALCULATIONS OF WHEEL LOAD STRESSES RG
9 C- (20,21,23,30,48,83)/14 DESIGN OF A LIFT IRRIGATION SCHEME PKK
10 C- (04,17,45,47,56)/14 COMPARISION OF BEARING CAPACITY OF DIFFERENT PLATES BY EXPERIMENTAL AND ANALYTICAL METHODS NMC
11 C- (32,38,42,82)/14, 78/15(D) ANALYSIS AND DESIGN OF A TWO STOREYED HOSTEL BUILDING (INCORPORATING SEISMIC ANALYSIS AND FINITE ELEMENT METHOD: PART II) AKD
12 C- (25,26,40,74)/14 DETAILED ANALYSIS AND DESIGN OF CROSSARM OF A TRANSMISSION TOWER GH
13 C- (09,37,53,69)/14, 83/15(D) BEARING CAPACITY FOR DIFFERENT TYPES OF FOUNDATIONS FOR THE CONSTRUCTION OF A NEW BOYS HOSTEL IN JORHAT ENGINEERING COLLEGE CAMPUS AB
14 C- (12,27,43,70,80)/14, 69/12 SLOPE STABILITY ANLYSIS OF RIVER BRAHMAPUTRA AT NIMATI GHAT, JORHAT AB
15 C- (02,18,51,76,79)/14 THICKNESS DESIGN OF DIFFERENT LAYERS OF A FLEXIBLE PAVEMENT AND BLENDING OF MATERIALS FOR INDIVIDUAL LAYERS AS PER MORTH GUIDELINES RG
16 C- (11,19,2849)/14, 82/15 (D) ANALYSIS AND DESIGN OF A 3 STOREYED HOTEL BUILDING (INCORPORATING SEISMIC ANALYSIS AND FINITE ELEMENT METHOD: PART II) AKD
17 C- (29,31,44,60,66,75)/14 ADVANCEMENT IN CONCRETE TECHNOLOGY USING LOCALLY AVAILABLE FIBRES NMC

 

8TH SEMESTER PROJECT VIVA SCHEDULE- 2017  Date : 07.06.2017

Sl no ROLL NO TOPICS GUIDES Board Time
10 C- (46,56,71)/13, 72/12 Alignment For A Two Lane Bypass Road For Jorhat Town From Murmuria To NH-37 Using DGPS And ARCGIS Dr. M. K. Dutta II 8.00-8.30
11 C-(10,49,51,55,60,67)/13 Meteorological Study In Jorhat Engineering College Campus, Jorhat  

Dr. P. K. Khaund

 

II

 

8.30-9.00

12 C- (02,04,15,37,44, 58)/13, Thickness Design Of Pavement Layers (Cbr Method) Including Mix Design Of G.S.B & Bituminous Base Course  

R. Goswami

 

II

 

9.00-9.30

13 C- (33,43)/13, 83/14(D), 23/10 Design Of Concrete Mix Design As Per IRC 44-1976 A.     Das II 9.45 -10.15
14 C- (07,08,18,42,63)/13, 73/12

 

Sub-Soil Investigation of A Multi-Storeyed Building  

Dr. P.K. Khaund

II 10.15 -10.45
15 C- (54,68,70,76,77)/13, 76/14(D) Study Of Erotional And Depositional Features Of Dikhow River And Its Bank Stability Analysis Dr. M. K. Dutta II 10.45- 11.15
16 C- (22,23, 64, 65)/13, 81/14(D) A Detailed Sub Soil Investigation And Design Of Sub Structures For The Construction Of A Proposed Multi Storied RCC Building R. Goswami II 11.15-11.45
17 C- (09,21,30,63,81,)/13, 67/11, 43/10 Bearing Capacity Of Different Types Of Foundations Of A Multi Storied Building Dr. A. Bhattacharjee II 11.45 – 12.15

 

8TH SEMESTER PROJECT VIVA SCHEDULE  : 07.06.2017

Sl no ROLL NO TOPICS GUIDES Board Time
1 C- (03,05,19,20,29)/13, 60/12 Study On Load Settlement Characteristics Of Skirted Foundation Dr. N. Chetia  

I

 

8.00-8.30

2 C- (16,17,36,62,78)/13 Detailed Analysis And Design Of A Cross-arm of A Transmission Tower  

G. Hazarika

 

I

 

8.30 -9.00

3 C- (26,35,39,40,45,59)/13

 

Seismic Analysis And Dsign Of A Three Sroried Residential Building  

Dr. A.K. Dutta

 

I

 

9.00-9.30

4 C- (32,34,41,57,69)/13, 11/11 Detailed Design Of A Multistoried Apartment Building Dr. N. Chetia I 9.45- 10.15
5 C- (28,38,52)/13, 77/14(D), 60/11 Bearing Capacity Of Different Types Of Foundations Of A Multi Storied Building Dr. A. Bhattacharjee  

I

10.15 -10.45
6 C- (01,24,31,66,75)/13, 81/14(D)

 

Pavement Design Of The Bhogdoi River Bridge Approach Dr. A. Bhattacharjee  

I

10.45- 11.15
7  

C- (06,14,50,72)/13, 52/12, 61/10

Rechecking Of Design Of Rcc Bridge Of 24.75m Single Span Over The Rivulet At Garumarajan On Digboi Duliajan Road G. Hazarika I 11.15 -11.45
8 C- (11,12,47,48)/13, 78/14 (D), 82/12(D) Seismic Analysis And Dsign Of A Three Sroried Residential Building ( Part-II)  

Dr. A. K Dutta

I 11.45-12.15
9 C- (13,25,27,53)/13, 71/11

 

Design And Analysis Of Cantilever Retaining Wall  

D. Baglari

 

I

12.15-12.45

 

REVISED  SCHEDULE FOR 8th SEMESTER PROJECT VIVA, JUNE 2016

SL NO. ROLL NO. NAME OF GUIDE DATE TIME
1. C-[(46,80)/12, (02,47)/10] D. Baglari  

 

 

 

 

 

 

 

 

10.06.16

 

 

 

 

 

 

08.30 -09.00
2. C-[(17,40,42,74)/12] G. Hazarika 09.00- 09.30
3. C-[(33,43,57,70)12,20/11] A.Deka 09.30-10.00
4. C-[(01,02,23,29,51)/12] Dr. P.K. Khaund 10.20-10.30
5. C-[(11,15,16,21)/12, 82/13(D)] P. Dutta 10.30-11.00
6. C-[(13,19,36,37)/12, 76/13(D)] Dr. A. K. Dutta 11.00-11.30
7. C-[(06,10,28,48)/12, 55/11] Dr. A. Bhattacharjee 11.30-12.00
8. C-[(05,12,49,53)/12, 80/13(D)] Dr. M.K. Dutta 12.00-12.30
9. C-[(27,45,50,54)/12, 79/11] Dr. N.M. Chetia 12.30-13.00
LUNCH 13.00-14.00
10. c-[(61,65,75,79)/12, 40/10] R. Goswami 14.00-14.30
11. C-[(04,25,30,81)/12] Dr. M.K. Dutta 14.30-15.00
12. C-[(24,26,39,41,44)/12] Dr. A. K. Dutta 15.00-15.30
13. C-[(09,76)/12, 73/11, 78/13(D) R. Goswami 15.30-16.00
14. C-[(32,34,38)/12, 79/13(D), 80/11] Dr. N.M. Chetia 16.00-16.30
15. C-[(62,66,67,68)12, 42/09] A.    Das 16.30-17.00
16. C-[(03,18,59,71)/12] Dr. P.K. Khaund  

11.06.16

 

08.30-09.00
17. C-[(08,14,22,47,77)/12] Dr. B.N. Choudhury 09.00-09.30
18. C-[(56,58,70/12),83/13(D), 70/11] Dr. B.N. Choudhury 09.30-10.00
19. C-[(31,78)/12, (77,81)/13D] Dr. A. Bhattacharjee 10.00-10.30

** Students must submit their Project Report (signed from their respective Guides) to the undersigned on or before 08.06.16 (before12.00 Noon).

** Students must report atleast 15 minutes before schedule time.