EXTENSION OF TIME : NOTICE INVITING LIMITED TENDER FOR PROVIDING CANTTEEN SERVICES at JORHAT ENGINEERING COLLEGE

NOTICE INVITING LIMITED TENDER FOR PROVIDING CANTTEEN SERVICES at JORHAT ENGINEERING COLLEGE, JORHAT-785007(Assam)

TENDER NO. JEC/TENDER/CANTEEN/2021/01 DATED 08.12.2021 ………….  download

Sealed tenders in two bid system i.e. “Technical Bid” & “Financial Bid” addressed to the Principal, Jorhat Engineering College are invited from eligible contractors for providing canteen services in the College. Prescribed tender form containing Terms & Conditions is available on the college website www.jecassam.ac.in. The cost of the Tender Form is Rs. 500/- (Non-Refundable). Tender document can be downloaded from www.jecassam.ac.in and a bank draft of Rs. 500/- must be enclosed while submitting the duly filled in tender document. The last date of submission of tender shall be 31.12.2021 at 2 PM. No tender form shall be accepted after the last date and scheduled time.

The Technical Bid shall be opened on 03.01.2022 at 11.30 am in the Professors’ Conference Room in the presence of interested parties/authorized representatives. They should make themselves available for the same.

The contractor must submit:-

  1. EMD in the form of DD/FDR/Bank Guarantee amounting to Rs. 10,000/- (refundable) in favour of the Principal, Jorhat Engineering College.
  2. Declaration form on firm’s letter head duly
  3. The Demand Draft of Rs. 500/-, the DD should be drawn in favour of “The Principal, Jorhat Engineering College payable at SBI,JEC Branch, Jorhat.
  4. The terms and conditions form should be duly signed by the tenderer on each
  5. List of Quoted rates for the items to be served should be duly signed by the tenderer on each

The duly filled Tender along with all necessary documents may be submitted to the Principals Office during working hours.

The undersigned reserves the right to accept or reject any or all the tenders submitted without assigning the reasons thereof.

Related Link

Scroll to Top