DESIGN, ENGINEERING, SUPPLY, ERECTION & COMMISSIONING OF CENTRALLY COOLED AIR CONDITIONING SYSTEM WITH DUCTING AT NEWLY CONSTRUCTED AUDITORIUM OF JORHAT ENGINEERING COLLEGE ; Tender document download
TENDER DOCUMENT OF CENTRALLY COOLED AIR CONDITIONING SYSTEM WITH DUCTING AT NEWLY CONSTRUCTED AUDITORIUM OF JORHAT ENGINEERING COLLEGE
Related Link
ISTE Student Chapter Celebrates Engineer’s Day 2026
September 15, 2026
4:33 PM
3rd round admission CEE 2026
September 7, 2026
10:10 PM
Induction Program 2026
September 2, 2026
7:08 PM
CEE counselling 2026 upgradation
August 28, 2026
11:00 PM
Internal Hackathon JEC 2026
August 26, 2026
8:49 AM