DESIGN, ENGINEERING, SUPPLY, ERECTION & COMMISSIONING OF CENTRALLY COOLED AIR CONDITIONING SYSTEM WITH DUCTING AT NEWLY CONSTRUCTED AUDITORIUM OF JORHAT ENGINEERING COLLEGE ; Tender document download
TENDER DOCUMENT OF CENTRALLY COOLED AIR CONDITIONING SYSTEM WITH DUCTING AT NEWLY CONSTRUCTED AUDITORIUM OF JORHAT ENGINEERING COLLEGE
Related Link
Mock Interview Programme
October 29, 2026
6:30 PM
ASIP BUILD CLUB WORKSHOP
October 7, 2026
12:53 PM
ISTE Student Chapter Celebrates Engineer’s Day 2026
September 15, 2026
4:33 PM
3rd round admission CEE 2026
September 7, 2026
10:10 PM
Induction Program 2026
September 2, 2026
7:08 PM